Benchmark - 1-1965 NEWC

Benchmark Number 1-1965 NEWC
Established In
Condition UNKNOWN
Latitude
Longitude
Coordinate Accuracy UNKNOWN
Reference Benchmark No
Vertical Datum Code UNKNOWN
Type UNKNOWN
Setting NA
Description NB Electric Power Commission generating plant on the NW shore of Grand Lake, tablet in top and in centre of most E'ly of three concrete piers protecting plant inlet screen. Established by CHS.

Elevations

Date Elevation (m) Status Vertical Datum Code
2025-01-01 6.39 ACTIVE CD